The period between signing a contract and the first day of construction is when most renovation problems are either prevented or created. This pre-construction checklist covers everything a homeowner should verify, finalize, and prepare before the first board is removed.
Contract and Scope
- ☐Signed contract in hand — reviewed and understood in full
- ☐Scope of work is detailed and specific — not vague or open-ended
- ☐Payment schedule tied to project milestones — not arbitrary dates
- ☐Change order process clearly defined in writing
- ☐Project manager's direct contact information confirmed
Permits and Approvals
- ☐All required permits have been applied for
- ☐Permit approval received before demo begins (never start without approved permits)
- ☐HOA approval obtained if required by your community
- ☐Historic district BAR approval obtained if applicable (downtown Charleston properties)
Material Selections and Procurement
- ☐Every material selection finalized — cabinets, countertops, tile, flooring, fixtures, appliances, hardware
- ☐All long-lead items ordered with expected delivery dates confirmed
- ☐Delivery dates verified to align with construction sequence
Site and Living Preparation
- ☐Pre-construction meeting scheduled and attended
- ☐Daily work hours and site access protocol agreed upon
- ☐Dust and debris protection plan established for the home
- ☐Valuables and fragile items removed from construction areas
- ☐Temporary living arrangements confirmed with buffer time built in