Kitchen remodels in Charleston typically take 10–16 weeks from start to finish. Here's what to expect in each phase—and what causes delays.
Finalize layout, select cabinetry, countertops, appliances, and finishes. Our design team works with you to ensure all decisions are locked before construction begins.
Charleston permits for electrical, plumbing, and building work. Plans are submitted for review. Inspections are scheduled. This phase is often the longest unpredictable variable.
Existing cabinets, countertops, flooring are removed. Walls are assessed. Mechanical, electrical, and plumbing systems are evaluated.
Plumbing lines are run. Electrical circuits are installed. HVAC work is completed. Framing and structural changes (if needed) are finished.
Cabinet installation, countertop fabrication and installation, flooring installation, appliances are connected, lighting and fixtures are installed.
Final building inspections. Punch list items are completed. Final cleanup and walkthrough.
Charleston permits can experience 2–4 week delays during busy seasons. Plan review backlogs are common. Multiple inspections are standard.
Pre-1960s Charleston homes often reveal unexpected issues when walls are opened: outdated plumbing, corroded electrical, structural damage, asbestos.
Custom cabinetry, some countertops, and special finishes have 4–12 week lead times. Delays in material delivery cascade through the schedule.
Charleston humidity can slow drying times for paint, sealant, and finishes. Summer storms can delay work.