Home additions take 16–24 weeks. Complex permitting and foundation work impact timelines.
Architect, engineer, design decisions finalized.
Complex process: structural review, zoning variance (if needed), building permits.
Grading, foundation design, concrete pour.
Structural framing installed.
Mechanical, electrical, plumbing rough-ins.
Interior finishes, flooring, fixtures.
Setbacks, height limits, lot coverage. Variances add 4–8 weeks.
Poor soil, existing foundation challenges.
Termite damage, poor grading, utilities in the way.
Windows, doors, custom elements can delay 4–8 weeks.