Isle of Palms additions face extreme salt spray and flooding risk. Our waterfront expertise ensures structural durability and code compliance in high-exposure locations.
Metal studs, hurricane-rated connectors, enhanced bracing for wind exposure.
Elevated structures, open foundations, waterproofed utilities for storm surge.
Hot-dip galvanized fasteners, marine-grade lumber, stainless hardware.
Sealed exterior, protected interior, moisture barriers, high-end ventilation.
4-6 weeks. Structural engineer required for waterfront design.
6-8 weeks. Army Corps, DNR, flood mitigation review required.
12-16 weeks. Waterfront logistics extend typical timelines.